Saturday, June 13, 2009
Roof Project Update
The roof is almost complete. The only things left to do is metal work, i.e. new stair to the elevator maintenance rooms, new access stairs to the roof (from the 8th floor), and railings on the roof (required by code). The metal work should be done and the installation started around June 29, 09. It should take less than a week to install, and then we are done! Except for paying the bills.